NTTX Engineering Case Studies
Communications Success!
Our Client, Thales, is under Contract to install their proprietary Transmission Based Train Control system across the Jubilee, Northern and Piccadilly Lines.view case study »Workload concerns prompt review
Concerns over extra work for signallers prompted a review of the signalling controls operation for the underground railway line serving Heathrow Airport’s new Terminal 5.view case study »A place in transport history
To be part of such an important project as Heathrow Terminal 5 gives us great pride as we secure our place in transport history.view case study »Client’s needs on the line
An objective third party review is vital for responsible consultancies to assess if their client’s obligations are being met.view case study »Green light for signalling
The signalling upgrade to the London Underground’s Jubilee and Northern Lines was being implemented by Thales Rail Signalling Solutions Ltd on behalf of Tube Lines Ltd.view case study »New role – new challenges
London Underground’s Chief Engineer needed support in developing the new role of operational engineerview case study »